How it runs today
- 01The documents arrive as a PDF bundle, sometimes with hundreds of items.
- 02Someone skims them and decides whether costing is worth it.
- 03If it is costed, items are matched by hand against your own range of services.
Use case · Mechanical engineering
In mechanical engineering a tender arrives as a specification: technical requirements, standards, interfaces and acceptance conditions across sixty pages. Whether your own works can supply it is not stated in one line item but spread across the whole document.
Highest value per individual case
What is different here
Not a bill of quantities with line items but requirement sentences - “shall”, “should”, “may”. The distinction decides the effort and is reliably missed when skimming.
Machinery directive, CE, sector-specific standards, sometimes a customer's own works standards. Whatever cannot be met makes the entire costing pointless - and it usually sits in an annex.
Special machinery hangs on bought-in parts with long lead times. Whether a date will hold is only known once the critical items have been enquired about.
If yours is not listed, that is not an exclusion. Where no interface exists, we build one - that is the most demanding part and it is our trade.
In mechanical engineering the exclusion criterion sits in running text, not in a line item. Skim the document and you find it reliably too late.
The difference
A person does itThe system does it
How it runs today
How it would run with us
What it gets you
Where it does not fit
Where an award turns on references and relationships, an evaluation helps little - there it is not the document that decides.
In mechanical engineering the exclusion criterion sits in running text, not in a line item. Skim the document and you find it reliably too late. Whether it pays for you depends on your volume - the audit establishes that.
Yes. The ones listed are those we most often meet in mechanical engineering - a list, not a precondition. Where no interface exists, we build one.
Your range of services in structured form - a list is enough, it only has to be complete. Ten to twenty past tenders together with the decision you took at the time. A contact in costing for the questions of the first weeks. Nothing more is needed to start.
Across 20 real tenders the "cost it / drop it" recommendation agrees with yours in at least 85 %. The item list is read out in full - verified by spot check against the PDF. No bid is submitted without a person looking at it.
5 to 8 weeks - the most demanding of the eight cases.
The evaluation runs independently; the decision to take part is made by a person. A tender wrongly dropped is never seen again.
Where an award turns on references and relationships, an evaluation helps little - there it is not the document that decides.
This page shows the fit in mechanical engineering. The process itself is sector-independent - what matters is whether it repeats.
Tenders in generalYou tell us where your time goes. We put it in writing: what is worth automating, and roughly what that costs.