Perspective
What an AI project costs in a mid-sized business
You rarely get a number in answer to this question, and there is a real reason for that: the effort hangs on things nobody knows before the first inspection. What it hangs on can be said precisely, though - and with it, what makes a project more or less expensive in your case.
Last updated: July 2026
01
What drives the price up
- The number of systems involved
- A process that reads one system and writes back into the same one is a different project from one that touches ERP, mailbox, file store and a portal. Every connection is effort, and it is the most reliable cost driver.
- Missing interfaces
- If a legacy system has no way out, we build one. That is almost always possible but it costs - and it is the point at which a project can eat up its own benefit.
- The number of formats
- Four suppliers with four invoice layouts is routine. Forty is a work package of its own.
- How expensive an error is
- A process with high error costs needs more checks, more test cases and a tighter acceptance. That is right, but it costs.
- How clear the rules are
- Where the business disagrees about how a case should be handled, the project settles that question too. That is valuable and was rarely budgeted for.
02
What brings the price down
The strongest effect comes from the scope. A process limited to the recurring core, deliberately leaving the special cases to a person, costs a fraction and often delivers the larger share of the saving. The last fifteen per cent of coverage regularly cost more than the first eighty-five.
The second lever is the order. Starting with a process whose data has to be opened up anyway lowers the cost of every subsequent process in the same business - which is why every further process costs less than the first.
The cheapest route into an AI project is a smaller first process, not a cheaper provider.
03
When it pays
Do not calculate with headcount saved. That is rarely the effect and it is a poor start with the workforce. Calculate with the time that flows back into the work currently left undone: quotations that go out faster, enquiries that do not go unanswered, analyses that arrive while they can still change a decision.
For scale: a process that ties up one person-day a month costs you a mid four-figure sum a year in working time. If it ties up three, the payback on a single process project sits in the range of one to two years - before any of the softer effects.
Felix Straub
Founder
Frequently asked
Why is the second process cheaper than the first?
Because the most expensive part - access, opening up the data, connecting systems - is done once with the first process and then stands. The second process uses the same foundation.
Can we start with a small project?
That is the recommended route. A system integration or the sorting of a shared mailbox is one of the smaller undertakings, productive in two to four weeks, and it shows an effect in daily work immediately.
Where it gets concrete
Use cases on this topic
Let us start with a conversation.
You tell us where your time goes. We put it in writing: what is worth automating, and roughly what that costs.